SITE DETAILS
Built with people & progress in mind
The plan for OKC 577 goes beyond its design and construction. It’s a foundation for futures – those of the businesses who locate here and the people who put their time and talents to work for them. Attract top talent with a site centered on making quality work life a priority.
Site I is currently under development and Site E is nearly complete for Locke Supply. The rest of the site map is for reference only and can be modified.
Park Utilities
-
• Substation on-site, main substation 1 mile± east
• Total capacity - 60 MW
• Available - 25 MW
• Distribution voltage - 12.47 kV
• Transmission line servicing substation - 138 kV
-
• 12”, 6” & 2” lines serving the site
• 190 - 250 PSIG pressure
• Total capacity - 300 MCFH
• Available - 20 MCFH
-
• 48”, 16” & 12” lines serving the site
• Water treatment plant total capacity - 225M GPD
• Available - 100M GPDe
-
• 12” & 8” lines serving the site
• Wastewater treatment plant total capacity - 80M GPD
• Available - 20M GPD
Multiple
Access Points
Natural Park Features
Providing efficient traffic flow
Enhancing the park’s setting
Gathering Spaces
Pedestrian Friendly
Responsibility and sustainability are key components in the park
Activity Spaces
Environmental
Promotes health and wellness
Site Flexibility
Central Spine
Building sizes can change to meet and react to market demand
Maximizing site access
Allows all forms of movement through the park
Improves quality of work life